Fsr FL-500P Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Équipement Fsr FL-500P. FSR FL-500P User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
These floor boxes are designed for conference rooms, auditoriums, banquet halls, etc. with carpet, tile or wood flooring
over concrete. This floor box provides a practical solution for cable storage while maintaining easy access. The lift off
section of the cover allows full access to internal cables and connector plates while a smaller hinged trap-door opens in to
create a cable exit.
Before proceeding with the installation please take time to review the drawings on the opposite side of this
page.
STEP 1
Locate the finish cover and store it in a safe place. This won't be needed until the carpet is to be laid.
STEP 2
Locate the box complete with the temporary cover. Remove the temporary cover and connect all conduits as required.
Reinstall the temporary cover and use the leveling feet to position the box such that the top of temporary cover is flush with
the surface of the concrete floor.
Step 3
After the concrete floor is cured remove the temporary cover and install all the cables and connectors as required.
Reinstall the temporary cover.
Step 4
Prepare to install the finish cover. Remove the temporary cover and discard it. Place a bead of silicone sealant around the
edges of the box (see dwg.). Place the finish cover with carpet flange facing up on the box and secure with the screws and
small o-rings supplied (see dwg.).
FINISH COVER SCREW AND O RING
Step 5
Install the carpet, tile or wood flooring in and around the floorbox carpet flange.
Step6
Turn the four ¼ turn screws counter clockwise to remove the access panel. Install the required cables and make the
appropriate connections. Open the trap door on the access panel all the way to allow the velcro retaining tabs to
touch. Replace the access panel while allowing cables to exit through the trap door opening. Turn the four ¼ turn
screws clockwise to secure the access door. Make sure all of the screws are completely seated to avoid a
“trip” hazard.
CONCRETE SURFACE RTV 1/4" BEAD ALL AROUND 1/4 TURN SCREWS
FF
FF
F
SS
SS
S
RR
RR
R
FL-500P FL-600P
METAL PRODUCT GROUP
INSTALLATION INSTRUCTIONS
LIT1020 5/03
FSR Inc 244 Bergen Boulevard, West Paterson, NJ 07424
Phone: 973-785-4347 Fax: 973-785-3318 Web: www.fsrinc.com E-Mail: [email protected]
CLOSE UP OF RTV ADHESIVE INSTALLED
CLOSEUP OF 1/4 TURN SCREWS
Vue de la page 0
1 2

Résumé du contenu

Page 1 - FL-500P FL-600P

These floor boxes are designed for conference rooms, auditoriums, banquet halls, etc. with carpet, tile or wood flooringover concrete. This floor box

Page 2

11GAUGE STEEL COVERMITERED BRASS OR ALUMINIUMCARPET EDGING 1/2" or 1/4" HIGHFOLD BACK CABLE EXITLIFT-OFF FULL ACCESS DOOR1" or 1-1/4&q

Modèles reliés FL-600P

Commentaires sur ces manuels

Pas de commentaire